Celebration Square power station rehabilitation project / International Zone Iraq / Baghdad
Rehabilitation, repair and replacement of all damaged parts of the station parts, including (circuit breakers, lifting old cables, preparing cables, wiring and connecting new cables, replacing the transformer with a capacity of 16 MV, rehabilitating the building, which includes painting, repairs and health)
Location: The Green Zone / Baghdad
The beneficiary:
Joint Support Department / US Embassy
Supplying and installing a water treatment unit plant with a capacity of 200 m3 / hour for the Red Cross Organization
Work was involved
1- Equipping, installing and operating a unit system Water treatment capacity of 200 m3 / hour
2- Rehabilitation and operation of the old station with a capacity of 50 m3 / hour.
The work was in cooperation with Al-Faseel General Contracting Company
Location: Al-Amari city / east Baghdad
The beneficiary:
Red Cross Organisationh
Establishing a school in Tasulja / Sulaymaniyah / Kurdistan region / Iraq
Work includes
1- Construction of 11 caravans with the supply and erection of 11 split walls
2- Preparing the materials and constructing a yard of reinforced concrete
3- Create an iron roof
4- Carrying out all electrical and sanitary works
5- Constructing a fence from BRC
Location / Sulaymaniyah / Kurdistan Region / Iraq
The beneficiary:
UNESCO / Iraq
Rehabilitation of the water purification plant in the Green Zone
Equipping and installing 6 lifting pumps
2- Supplying and installing vacuum pumps
3- Rehabilitation of the water outlet.
4- Supplying the automatic electricity control panel.
5- Supplying, installing and operating all locks
And accessories
6- Carry out operating and checking station work
Location / International Zone / Baghdad / Iraq
The beneficiary:
The US Army / International Zone / Baghdad / Iraq
Carrying out paving works in Baghdad, with a length of 10 km, in cooperation with Al-Nasser Group
Equipping and installing 6 lifting pumps
2- Supplying and installing vacuum pumps
3- Rehabilitation of the water outlet.
4- Supplying the automatic electricity control panel.
5- Supplying, installing and operating all locks
And accessories
6- Carry out operating and checking station work
Location / International Zone / Baghdad / Iraq
The beneficiary:
The US Army / International Zone / Baghdad / Iraq
The beneficiary: Joint support department US Embassy Rehabilitation works for a secondary school and primary school / Al-Qadisiyah complex / International Zone / Iraq
The rehabilitation of a primary school and a secondary school, and the work involved rehabilitating all electrical work, sanitary works, repair work, lifting and replacing damaged ceramic tiles for bathrooms and floors, while carrying out work to replace all sanitary structures with preparing school trips and furnishing the administration room
The site / the Green Zone / Baghdad
Project for the rehabilitation of Karrada power station / International Zone / Iraq - Baghdad
Rehabilitation, repair and replacement of all damaged parts of the station parts, including (circuit breakers, lifting old cables, preparing cables, wiring and connecting new cables, replacing the transformer with a capacity of 16 MV, rehabilitating the building, which includes painting, repairs and health)
Location: The Green Zone / Baghdad
The beneficiary:
Joint support department US Embassy
Celebration Square power station rehabilitation project / International Zone Iraq / Baghdad